For equipment consultations or sales inquiry, please contact us at sales@leedem.com


Copyright 2014-2015 Leedem Mine Services Ltd.

Shaft Sinking Structures & Equipment

Leedem offers the entire shaft sinking structure, including:

 

Shaft sinking structure brochure.pdf

The MZJ shaft sinking headframes are standardized in design. Thousands have been made over the decades.


It is easy to be dissembled, transported, and re-assemble at site and used for multiple times.


Five models available in MZJ series for shaft sinking frames. Detail can be downloaded from the brochure link above.

High Manufacturing Precision

 

shaft sinking operation drawing pdf.pdfDownload Drawing File PDF

Structure Assembling

Dumping deck with chute mounted on a type II headframe

Galloway being assembled on site

A finished concrete form with curb ring on base


Sheave

Buckets with capacity of 1 to 5 cubic meters